Taliban start reconstruction of Salang pass tunnel
Representatives of the new Afghan government have allocated funds for the reconstruction of the Salang tunnel, which connects the northern and southern parts of the country. Let us recall that the representatives of the Taliban movement (* a terrorist group banned in the Russian Federation) constitute the core of the current Afghan government.
For the reconstruction of the tunnel on the Salang pass, 53 million afghanis (about 650 thousand US dollars) were allocated from the Afghan treasury.
Heavy construction equipment was brought up to the pass, including bulldozers, excavators and heavy-duty trucks.
According to the deputy head of the new Afghan Ministry of Finance, who launched the reconstruction of the Salang tunnel, this is the first part of a large-scale project, which includes the construction of a full-fledged highway through Salang. In connection with the start of work, representatives of the Taliban government * cut the ribbon. According to them, the reconstruction of the tunnel will be completed by November this year - in order to be in time before the onset of winter cold.
At present, the access roads to the Salang pass are being cleared. They (and the tunnel itself) suffered during the recently ended hostilities.
Recall that until recently Salang was held under their control by representatives of the militia of Ahmad Massoud. But the control was short-lived. Taliban units drove Masud's troops from a key pass, after which the militia accused the Taliban of using military aid from Pakistan. Participants in the fighting said that Pakistani special forces were acting against them on the side of the Taliban *. In Islamabad, these statements were called fake.
- Muhammadi700
Information